What an ADU costs in St. Petersburg
ADU projects with Construction Corps start at about $95,000 for a garage conversion. Detached new-build ADUs typically start around $200,000. Final cost depends on size, foundation and flood requirements, utility runs, and finishes. Our online estimator gives you a planning range in a few minutes, and the parcel review narrows it down for your lot.
How the process works
- Parcel review: zoning, lot size, flood zone, and utilities checked against city rules
- Design and engineering: plans drawn to fit the lot, the city's ADU standards, and your budget, with structural engineering by our in-house Florida-registered engineering firm
- Permitting: we prepare and submit the permit package and manage plan review
- Construction: our crews and licensed trade partners build the unit, with a single project manager as your point of contact
- Inspections and closeout: we schedule inspections and close out the permit
Timelines depend on plan review, inspections, weather, and trade scheduling. We give you a realistic projected schedule once the design is set.