renovation

By Matt Thompson, Owner and General Contractor at Construction Corps. U.S. Army combat veteran. Licensed general contractor since 2007, first in California; Florida licensed since 2022 (CGC, FBPE, EC, CFC, MRSR, MRSA). 35+ years in construction.

Last updated November 2026. Rules are cited to the City of Tampa's published ADU standards and zoning documents, St. Petersburg City Code Section 16.50.010 and the city's ADU program page, and the 2026 Florida Statutes, all checked November 9, 2026. City rules change by ordinance; confirm your parcel with each city before you design. General information, not legal advice.

"Key takeaways on ADU rules in Tampa and St. Petersburg

  • Tampa allows full ADUs only inside a mapped eligible area (expanded in 2024 to include Sulphur Springs, Temple Crest, Wellswood, and parts of Riverside Heights) through a Special Use 1 (SU1) zoning approval. Elsewhere in the city, the option is an Extended Family Residence for relatives only.
  • St. Petersburg allows ADUs in more neighborhoods after its July 2022 expansion, with lot minimums by zoning district: at least 4,500 square feet in NT districts; in NS districts at least 10,000 square feet, 4,500 square feet on an alley, or a corner lot meeting the district minimums.
  • Size caps differ: Tampa's general standards cap an ADU at 950 square feet; St. Petersburg caps it at 800 square feet, with all areas under roof limited to 67 percent of the principal home's floor area.
  • Owner residency differs: Tampa requires the owner to live on the property, in either the main home or the ADU, since its 2024 change. St. Petersburg's ADU page says the main home does not need to be owner-occupied, but a business tax certificate is required if both units are rented.
  • Both cities define an ADU by its own kitchen, bathroom, and sleeping facilities, and St. Petersburg's ADU page says it must be permitted and inspected as an independent unit. St. Petersburg bars transient use and its ADU page sets a 30-day minimum for residential rentals, with limited exceptions.
  • Flood rules can decide the project: St. Petersburg applies a 49 percent substantial improvement threshold, Tampa applies 50 percent of the structure's depreciated value, and new dwellings in flood zones must be elevated."

Tampa and St. Petersburg sit across the bay from each other and both say yes to accessory dwelling units, but they say it in very different ways. In Tampa, the first question is whether your lot sits inside the city's ADU-eligible area at all; outside it, a second unit is limited to family members. In St. Petersburg, most of the answer comes from your zoning district and your lot size, and the rules are written into one code section. Homeowners who read one city's rules and assume they apply across the bay can end up redesigning, or finding out their plan was never allowed.

This guide puts the two cities' current ADU rules side by side: where each city allows them, how big they can be, who has to live on the property, parking, rentals, the approval path, flood rules, and what drives cost. Every rule is cited to the city's own code or published documents, or to state law, and anything a city does not state plainly is marked as a question to confirm with that city. For the full Tampa permitting picture, including who issues permits across Hillsborough County, see our companion guide to building in Tampa and Hillsborough County.

Can I build an ADU in Tampa or St. Petersburg?

In both cities, often yes, but the test is different. In the City of Tampa, a full accessory dwelling unit is allowed only within the city's mapped ADU-eligible area, which the city expanded in 2024 to include Sulphur Springs, Temple Crest, Wellswood, and parts of Riverside Heights in addition to portions of Seminole Heights, East Tampa, Tampa Heights, and Armenia Gardens Estates; it goes through a Special Use 1 (SU1) zoning approval, can be up to 950 square feet under the city's general standards, and requires the owner to live on the property in either the main home or the ADU. Outside that area, Tampa allows only an Extended Family Residence for relatives. In St. Petersburg, ADUs are allowed in the zoning districts listed in the city's use matrix, subject to lot minimums (at least 4,500 square feet in NT districts; at least 10,000 square feet in NS districts, or 4,500 square feet on an alley, or a corner lot meeting the district minimums), a cap of 800 square feet with all areas under roof limited to 67 percent of the main home's floor area, and design and parking standards in City Code Section 16.50.010. Check your parcel on each city's ADU map lookup before you design.

1. Tampa vs St. Petersburg ADU Rules at a Glance

Rule City of Tampa (full ADU) City of St. Petersburg
Where allowed Only inside the mapped ADU-eligible area (expanded 2024). Elsewhere: Extended Family Residence only. Districts allowed by the use matrix, after the July 2022 expansion; lot minimums apply.
Approval path Special Use 1 (SU1) zoning application, then building permit. Building permit through the city's ePlan system; zoning standards in Section 16.50.010.
Lot minimum No ADU-specific lot minimum on the general standards sheet; setbacks and the 15 percent lot rule apply. Confirm with City of Tampa Zoning. NT: 4,500 sq ft. NS: 10,000 sq ft, or 4,500 sq ft on an alley, or a corner lot meeting district minimums. Other districts: district minimum lot area.
Maximum size 950 sq ft (general standards). 800 sq ft gross floor area, and all areas under roof no more than 67 percent of the principal home's floor area.
Owner residency Owner must live on the property, in the main home or the ADU (2024 change). City ADU page: main home need not be owner-occupied; business tax certificate if both units are rented.
Occupancy Maximum of two unrelated adults (general standards). No occupancy cap stated in Section 16.50.010.
Short-term rental Not addressed on the ADU standards sheet. Confirm with City of Tampa Zoning. No transient use. City ADU page: residential rentals 30 days or more; under 30 days only 3 times in any 365-day period.
Parking 1 space per unit. Spaces required by the use matrix, plus at least one unobstructed space reserved for the ADU; waiver only if all five transit and alley criteria are met.
Separate meters and address Separate utility meter permitted. Separate meters and address allowed.
Attached or detached Within the principal structure with a separate entrance, or a separate structure. Attached to the side or rear, or detached; entrance of an attached unit to the side or rear, not visible from the street.
Flood threshold (flood zones) Substantial improvement at 50 percent of the structure's depreciated value. Substantial improvement at 49 percent of the home's value.
Check your parcel City ADU GIS map viewer; Development and Growth Management, (813) 274-3100, option 2. City ADU Map Look-up, or email [email protected] with the address.


Tampa figures are from the city's ADU General Standards sheet, which applies within the ADU-eligible area except in neighborhood overlay and historic districts; those districts have their own guides. St. Petersburg figures are from City Code Section 16.50.010 and the city's ADU program page.

2. Tampa: Full ADUs Inside the Eligible Areas

Where Tampa allows full ADUs

According to the City of Tampa's August 2026 announcement on its ADU rule changes, ADUs were previously limited to portions of Seminole Heights, East Tampa, Tampa Heights, and Armenia Gardens Estates. The 2024 changes expanded eligibility north to Sulphur Springs and Temple Crest and west to Wellswood and parts of Riverside Heights. As of that August 2026 announcement, the city reported that 28 homeowners had started the ADU process since the change and seven had completed construction.

The eligible area is a mapped boundary, not a neighborhood name. Two homes in the same neighborhood can fall on different sides of the line. Use the city's ADU GIS map viewer, linked from tampa.gov/ADU, before you spend money on design. One caution: as of November 9, 2026, the city's ADU landing page still lists only the older four areas and still states that the main residence must be owner-occupied. The city's general standards sheet and its August 2026 announcement reflect the newer rules. Where the two conflict, confirm with City of Tampa Zoning before you rely on either.

The approval path: SU1 first, then the building permit

City of Tampa planning documents describe ADUs in the eligible area as permitted as special uses, and accessory dwelling requests appear as Special Use 1 (SU1) applications in the city's CARES neighborhood notice newsletter. In practice, that means a zoning approval comes before the building permit. Plan for the SU1 step in your schedule, and talk with Development and Growth Management before you file: (813) 274-3100, option 2, or [email protected].

Tampa's general standards

The City of Tampa's ADU General Standards sheet cites City Code Sections 27-290 and 27-132 and applies within the ADU-eligible boundary, except in neighborhood overlay and historic districts. Its standards:

  • Maximum size: 950 square feet.
  • Owner residency: the owner must reside on the property. The city's August 2026 announcement explains that the owner may live in either the main home or the ADU.
  • Maximum occupancy: two unrelated adults.
  • Parking: one space per unit.
  • Utility meter: a separate meter is permitted.
  • Location: within the principal structure with a separate entrance, or in a separate structure.
  • Height: the sheet ties maximum height to the height allowed for the principal structure in the underlying zoning district. Confirm the figure for your district with City of Tampa Zoning.
Minimum setback (Tampa general standards) RS-75, RS-100, RS-150 All other districts
From street 60 ft 60 ft
From principal structure (eave to eave) 10 ft 5 ft
From street side (corner lots only) 15 ft  7 ft
From rear lot line 3 ft 3 ft 
From side interior lot line 3 ft 3 ft 
ADU structure over 15 percent of lot size 20 ft rear, 7 ft side 20 ft rear, 7 ft side


Two practical notes. First, the 15 percent rule matters on smaller lots: once the ADU structure exceeds 15 percent of the lot area, the rear setback jumps from 3 feet to 20 feet and the side setback from 3 feet to 7 feet, which can change a design that looked like it fit. Second, East Tampa, Seminole Heights, and Tampa Heights each have their own ADU guide on the city's ADU page, and Seminole Heights and Tampa Heights contain local historic districts, where exterior work and new construction need a Certificate of Appropriateness from historic preservation staff or the city's Architectural Review Commission. Our guide to renovating in Tampa's historic districts covers that process.

What counts as a dwelling in Tampa

The City of Tampa's draft multimodal fee study (November 2025) describes the code's ADU definition (Section 27-43) as finished interior space with its own independent kitchen facilities, including a cooking element, plus sanitary and sleeping facilities, and notes that a cooking element may be just a microwave or hot plate. In other words, adding a kitchenette to a guest suite or detached studio can bring it under the city's ADU rules. If you are planning a pool house, studio, or guest room that is not meant to be a dwelling, confirm with City of Tampa Zoning before adding any cooking element.

3. Tampa: Extended Family Residences Everywhere Else

Outside the ADU-eligible area, the City of Tampa allows a second living unit only as an Extended Family Residence (EFR). The city's Land Development Code Assessment (public draft, February 2025), summarizing City Code Section 27-132, describes the EFR standards this way:

  • Size: no larger than 600 square feet.
  • Occupants: no more than two, and only family members related by marriage, blood, adoption, or legal guardianship.
  • Purpose: intended to meet a temporary need.
  • Owner residency: the owner must live in the principal structure, not the EFR.
  • Duration: the special use permit is valid for one year.

An EFR is filed as a Special Use 1 application through the city's Accela Citizen Access system. The city's application package requires public notice under City Code Section 27-149, a to-scale site plan, and a notarized owner affidavit (with agent authorization where an agent files), and states that an approved site plan is binding on the owner and successors in title. The city does not review private deed restrictions or covenants, so check your plat, title, and HOA documents separately.

The practical difference is large. A Tampa ADU inside the eligible area can be up to 950 square feet, the owner can live in it, and the city describes ADUs as a possible rental opportunity. An EFR is smaller, limited to relatives, tied to a temporary need, and leaves the owner in the main home. If your property is near the edge of the eligible area, the map lookup decides which of the two you can build

4. St. Petersburg: One Code Section, Lot Size Decides

Lot and district requirements

St. Petersburg expanded ADU eligibility into more neighborhoods in July 2022. Under City Code Section 16.50.010.5.1, a new ADU is allowed only if the lot meets these minimums:

  • NT districts (traditional neighborhoods): lot area of at least 4,500 square feet.
  • NS districts (suburban neighborhoods): lot area of at least 10,000 square feet; or at least 4,500 square feet if the lot is on an alley; or a corner lot that meets the district's minimum lot area and width.
  • Detached ADUs: the legal front and rear of the lot must be consistent with the other lots on the same block face. An attached ADU is not permitted where lots have been refaced so the legal front yards face a different direction than the rest of the block, or where refacing eliminated alley access.
  • All other districts: the lot must meet the district's minimum lot area.

The code allows one ADU per single-family dwelling, only after construction of the principal building has started or a lawful principal use exists, and the ADU must be subordinate to the main home in location, square footage, and building coverage. A lot with an ADU cannot be split to separate the ADU unless the division meets all zoning and land development standards on its own. To confirm eligibility, use the city's ADU Map Look-up or email [email protected] with the address.

Size and design

  • Size cap: gross floor area no more than 800 square feet, and all areas under roof no more than 67 percent of the principal home's floor area. For a detached ADU, the cap applies to the ADU plus any accessory living space in the same building, including storage, bathrooms, and shared laundry, excluding up to 300 square feet per required parking space for up to three enclosed spaces.
  • NS side setback: detached ADUs in NS districts need a 10-foot side yard, or 7.5 feet on an alley lot. Attached ADUs follow the district setbacks.
  • Second-story privacy: porches, balconies, and unenclosed stairs on a second-story ADU face the interior of the property or meet at least a 10-foot side yard; sides with second-floor porches or unenclosed staircases facing a neighbor's interior side yard meet the district setback or 10 feet, whichever is greater.
  • Walkway: a paved walkway at least 2 feet wide connects the ADU entrance to the off-street parking.
  • Architecture: the building must meet the district's architectural standards and be compatible with the main home's style, including finishes, roof pitch, and paint scheme. The city's ADU page states that modular buildings and shipping containers can be used if they meet these design requirements.
  • Front garage conversions: the garage door must be removed and the enclosure made architecturally compatible, a 3-foot green yard is required between the wall and any remaining pavement, and required parking must be entirely on the property.

Parking

Under Section 16.50.010.5.4, the site must provide the parking required by the city's use matrix, and at least one required space must be an unobstructed space for the exclusive use of the ADU's occupants. Where the rear yard is on an alley, required parking goes in the rear yard. The parking requirement is waived only if the property meets all five criteria: within one-eighth mile (660 feet) of a high-frequency transit route; an ADU of 600 square feet or less; located on an alley; all of the main home's required parking accessed from the alley; and no front-loading driveway.

Owner occupancy, rentals, meters

St. Petersburg's ADU page answers the owner-occupancy question directly: the main unit does not need to be owner-occupied or homesteaded, but a business tax certificate is required if both units are rented. The code bars using an ADU as a transient accommodation, and the city's ADU page states that in residential districts rentals must be for 30 days or more, with rentals under 30 days allowed only 3 times in any consecutive 365-day period. Separate electric and water meters and a separate address are allowed. The code also states that its ADU provisions do not override deed restrictions or HOA declarations, although the city has no authority to enforce them.

Permit cost and review time, per the city

The city's ADU page gives an example: for an 800-square-foot ADU with one bathroom, permit-related fees of about $1,020, made up of a flat $187.50 permit fee plus $4.81 state surcharge, a $350 sewer impact fee for one water closet, a $419 multimodal impact fee (District 11, assuming no credits), and a $56.25 certificate of occupancy fee plus $1.28 state surcharge. The same page states plans are reviewed within 3 to 5 business days. Treat both as the city's published example, not a quote: fees vary by district and credits, and they change by resolution. Confirm current figures with St. Petersburg Planning and Development Services, (727) 893-7230.

5. What Florida Law Adds

Florida does not require cities to allow ADUs. FL Statute 163.31771 says a local government may adopt an ordinance allowing accessory dwelling units in any area zoned for single-family residential use; it defines an ADU as an ancillary or secondary living unit with a separate kitchen, bathroom, and sleeping area. Subsection (4) of the same statute states that an application for a building permit to construct an ADU must include an affidavit from the applicant attesting that the unit will be rented at an affordable rate to an extremely-low-income, very-low-income, low-income, or moderate-income person or persons. The statute is framed around ordinances adopted under that section, and neither city's ADU page mentions such an affidavit. Ask the city whether it applies to your permit before you plan a market-rate rental.

As of November 2026, there is no statewide ADU mandate. SB 48 (2026), which would have mandated ADU approval statewide, passed the Senate 38 to 0 on February 4, 2026 and died in House messages on March 13, 2026, and SB 184 (2025) also died. The rules in this guide are the cities' own.

Two state rules apply in both cities. First, under FL Statute 553.792, local building departments have statutory decision deadlines that start once a permit application is complete and sufficient; most residential permits under 7,500 square feet get a 30 business day clock for applicants using the department's plans reviewer, and the department has 5 business days to tell you what is missing. Our Pinellas permit timelines guide explains those clocks. Second, an owner who builds an ADU as an owner-builder becomes the responsible party of record under FL Statute 489.103(7), including direct onsite supervision of the work. St. Petersburg's ADU page states that a residential or general contractor is generally required unless the ADU is occupied by the property owner who qualifies under the owner-builder option.

6. Flood Zones Change the ADU in Both Cities

Roughly 75 percent of St. Petersburg lies in the FEMA Special Flood Hazard Area, according to the city's floodplain manager, and parts of Tampa do as well. Flood rules affect ADUs in two ways: new construction must be elevated, and work on an existing home can be capped by the substantial improvement rule.

  • New detached ADUs: a new dwelling in a flood hazard area is built with its lowest floor at or above the base flood elevation plus 1 foot, or the design flood elevation, whichever is higher, under Florida Building Code, Residential Section R322.2.1 (8th Edition, 2023; the same rule carries into the 9th Edition, effective December 31, 2026, for flood hazard areas other than Coastal A Zones). That affects the foundation, the steps or ramp to the door, and the budget.
  • Attached ADUs and conversions: an addition or a conversion is work on the existing home. If the home is in a Special Flood Hazard Area and the cost reaches the threshold, the whole structure must be brought into flood compliance. St. Petersburg applies a 49 percent threshold; its ADU page states remodeling is limited to 49 percent of the value of the home. The City of Tampa applies 50 percent of the structure's depreciated value, using the Hillsborough County Property Appraiser listing or a certified appraisal, with costs figured from the current ICC Building Valuation Data table.
  • Garage conversions: a garage slab is often below the required floor elevation for a dwelling. In a flood zone, that can rule out converting the garage at its existing level. Check the elevation certificate and the slab height before you design a conversion.

Questions go to each city's floodplain staff: [email protected] in St. Petersburg, and City of Tampa Construction Services at (813) 274-3100, option 1. Find your flood zone on FEMA's Flood Map Service Center (msc.fema.gov).

7. What an ADU Costs to Build

Construction cost depends mostly on the type of ADU, the site, and flood requirements. Construction Corps published 2026 turnkey pricing (design, engineering, permitting, and all rough and finish trades):

ADU type Published range What moves the number
Garage-to-ADU conversion From about $95,000 Slab elevation, new kitchen and bath plumbing runs, egress openings, separate entrance.
Detached new-build ADU Typically from about $200,000; ADU range runs to $725,000+ Foundation and flood elevation, independent utilities, impact-rated openings, size and finishes.
ADU range overall $95,000 to $725,000+ Garage conversions anchor the low end; detached new construction moves up the range.


Our published figures note that detached ADUs often carry their own impact fees of $4,000 to $9,000. Impact fees, utility tap fees, and city permit fees are set and billed by the jurisdiction and are passed through at cost as separate line items, so confirm them with the city for your parcel. Get a ballpark in about 90 seconds at constructioncorps.com/estimator.

8. A Five-Step Path to a Permit-Ready ADU

  • 1. Confirm eligibility. Tampa: check the ADU GIS map viewer, and if you are outside the eligible area, decide whether an Extended Family Residence fits your need. St. Petersburg: check the ADU Map Look-up and your lot area against the NT or NS minimum.
  • 2. Check flood status. Pull the flood zone and any elevation certificate. In a Special Flood Hazard Area, a new ADU is elevated, and an attached ADU or conversion is tested against the 49 percent (St. Petersburg) or 50 percent (Tampa) rule.
  • 3. Check private restrictions. St. Petersburg's code says the city has no authority to enforce HOA declarations or deed restrictions, and Tampa states it does not review them. They can prohibit what the city allows, so read them before design.
  • 4. Design to the city's standards. Size cap, setbacks, parking, and design compatibility differ by city, and in Tampa by overlay and historic district. In St. Petersburg, new structures need architectural or engineered plans with energy calculations and a site plan or survey, per the city's ADU page.
  • 5. Apply in the right order. Tampa: Special Use 1 zoning approval, then the building permit, plus historic review where it applies. St. Petersburg: building permit through ePlan.

We work plans first: the design, engineering, and zoning checks come before a fixed construction price, so the ADU is planned around a realistic budget. The majority of the plans we produce for homeowners go on to be built by us. We also produce plans for other contractors, who build those projects themselves.

9. Frequently Asked Questions

Does Tampa allow ADUs everywhere in the city?
No. The City of Tampa allows full accessory dwelling units only inside its mapped ADU-eligible area, which the city expanded in 2024 to include Sulphur Springs, Temple Crest, Wellswood, and parts of Riverside Heights, in addition to portions of Seminole Heights, East Tampa, Tampa Heights, and Armenia Gardens Estates. Elsewhere in the city, a second unit is allowed only as an Extended Family Residence for relatives. Check your parcel on the city's ADU GIS map viewer, linked from tampa.gov/ADU.

Do I have to live on the property to build an ADU in Tampa?
Yes. The City of Tampa's ADU General Standards require the owner to reside on the property. Since the city's 2024 change, the owner may live in either the main home or the ADU, according to the city's August 2026 announcement. For an Extended Family Residence, city planning documents state the owner must live in the main home. The city's ADU landing page still carries older owner-occupancy wording, so confirm with City of Tampa Zoning.

How big can an ADU be in Tampa?
Up to 950 square feet under the City of Tampa's ADU General Standards, which apply in the ADU-eligible area outside neighborhood overlay and historic districts. Overlay districts have their own guides. An Extended Family Residence is limited to 600 square feet, according to city planning documents summarizing City Code Section 27-132

How big can an ADU be in St. Petersburg?
Under St. Petersburg City Code Section 16.50.010.5.2, an ADU's gross floor area cannot exceed 800 square feet, and all areas under roof cannot exceed 67 percent of the floor area of the principal home. For a detached ADU, the cap includes any accessory living space in the same building, excluding up to 300 square feet per required parking space for up to three enclosed spaces. Setbacks may limit the size further.

Does St. Petersburg require the owner to live on the property?
St. Petersburg's ADU program page states that the main unit does not need to be owner-occupied or homesteaded, but if both the main home and the ADU are rented, a business tax certificate is required. Section 16.50.010 bars using an ADU as a transient accommodation, and the city's ADU page sets a 30-day minimum for rentals in residential districts, with rentals under 30 days allowed only 3 times in any consecutive 365-day period.

What lot size do I need for an ADU in St. Petersburg?
Under City Code Section 16.50.010.5.1, a new ADU in an NT district needs a lot of at least 4,500 square feet. In an NS district, the lot needs at least 10,000 square feet, or at least 4,500 square feet if it is on an alley, or it must be a corner lot that meets the district's minimum lot area and width. In other districts, the lot must meet the district minimum. Confirm with the city's ADU Map Look-up or [email protected].

Do I need an extra parking space for an ADU?
In Tampa, the ADU General Standards require one parking space per unit. In St. Petersburg, the site must provide the parking required by the city's use matrix, with at least one unobstructed space for the exclusive use of the ADU's occupants, unless the property meets all five waiver criteria in Section 16.50.010.5.4: within 660 feet of a high-frequency transit route, an ADU of 600 square feet or less, on an alley, all of the main home's required parking accessed from the alley, and no front-loading driveway.

Can I rent my ADU on Airbnb in St. Petersburg or Tampa?
Not as a short-term rental in St. Petersburg: the code bars transient use of an ADU, and the city's ADU page limits rentals under 30 days to 3 times in any consecutive 365-day period. Tampa's ADU General Standards do not address short-term rentals, and an Extended Family Residence is limited to family members. Confirm Tampa's current rental rules with City of Tampa Zoning, and check HOA and deed restrictions in both cities.

Does Florida law require cities to allow ADUs?
No. As of November 2026, FL Statute 163.31771 lets local governments adopt ordinances allowing ADUs in single-family zones but does not require them. SB 48 (2026), which would have mandated ADU approval statewide, passed the Senate 38 to 0 and died in the House in March 2026. The statute also says a building permit application for an ADU must include an affidavit from the applicant that the unit will be rented at an affordable rate. It is framed around ordinances adopted under that section, and neither city's ADU page mentions it, so ask the city whether it applies to your permit.

Who designs and builds ADUs in Tampa and St. Petersburg?
Construction Corps designs, permits, and builds garage-to-ADU conversions and detached ADUs across Pinellas, Hillsborough, Pasco, and Sarasota counties as a veteran-owned design-build general contractor based in Clearwater, holding Florida licenses CGC1530192, FBPE39242, EC13013956, CFC1432954, MRSR5676, and MRSA5772. Published ADU pricing runs $95,000 to $725,000 and up. Call (727) 999-1855.

Start with the parcel check

Construction Corps is a veteran-owned design-build general contractor based in Clearwater, serving Pinellas, Hillsborough, Pasco, and Sarasota counties. Before anyone draws an ADU, we confirm the city's eligibility map, zoning district, lot size, flood zone, and utility access, then tell you what fits and what it is likely to cost.

Thinking about an ADU in Tampa or St. Petersburg? Send us the address and what you have in mind.

  • Construction Corps, Inc.  |  2054 Weaver Park Drive, Clearwater, FL 33765
  • Phone: (727) 999-1855   |   Web: constructioncorps.com
  • Licenses: CGC1530192  |  FBPE39242  |  EC13013956  |  CFC1432954  |  MRSR5676  |  MRSA5772

About Construction Corps

Construction Corps, Inc. is a veteran-owned, full-service design-build general contractor headquartered at 2054 Weaver Park Drive, Clearwater, Florida 33765. Founded in 2022 and led by Matt Thompson, a U.S. Army combat veteran (Infantry, 11B) with 35+ years of construction experience, first licensed as a general contractor in California in 2007 and licensed in Florida since 2022, Construction Corps serves residential and commercial clients across the Tampa Bay region, including Pinellas, Hillsborough, Pasco, and Sarasota counties. The firm is an SBA-certified Service-Disabled Veteran-Owned Small Business (SDVOSB) and Veteran-Owned Small Business (VOSB), and is certified by the National Veteran Business Development Council (NVBDC) as a Service-Disabled Veteran-Owned Business (SDVOB). Construction Corps delivers design-build as one company, as full projects or plans first, holding Florida licenses CGC1530192 (general contractor), FBPE39242 (Florida Board of Professional Engineers), EC13013956 (electrical contractor), CFC1432954 (plumbing contractor), MRSR5676 (mold remediation), and MRSA5772 (mold assessor). Published project pricing is available at constructioncorps.com/estimator. Phone (727) 999-1855.

Sources cited

  • City of Tampa, Accessory Dwelling Units page and ADU GIS map viewer: tampa.gov/city-planning/accessory-dwelling-units
  • City of Tampa, Accessory Dwelling Unit (ADU) General Standards (citing City Code Sections 27-290 and 27-132): tampa.gov/document/accessory-dwelling-unit-adu-general-standards-173276
  • City of Tampa news release, City of Tampa to highlight the increase in ADUs since rule changes (August 19, 2026): tampa.gov/news
  • City of Tampa, Land Development Code Assessment, public draft (February 2025), ADU and Extended Family Residence summary of City Code Section 27-132: tampa.gov
  • City of Tampa, Special Use 1 (SU1) Extended Family Residence application package: tampa.gov/document/special-use-1-s1-extended-family-residence-application-11661
  • City of Tampa, CARES neighborhood notice newsletter (April 2026), Special Use 1 listings: tampa.gov
  • City of Tampa, Draft Multi-Modal Fee Nexus Report (November 2025), description of the ADU definition in City Code Section 27-43: tampa.gov
  • City of Tampa, FEMA Substantial Improvement and Damage form and hurricane recovery guidance: tampa.gov
  • St. Petersburg City Code Section 16.50.010, Accessory Dwelling (as amended through Ord. No. 611-H, July 10, 2025): library.municode.com/fl/st._petersburg
  • City of St. Petersburg, Accessory Dwelling Units program page (eligibility, owner occupancy, rentals, meters, fees, review time, flood): stpete.org/residents/housing/homeowners/accessory_dwelling_units.php
  • City of St. Petersburg, substantial improvement 49 percent rule: stpete.org/rule49
  • St. Petersburg Special Flood Hazard Area share (roughly 75 percent of the city), as stated by the city floodplain manager to the St. Pete Catalyst: stpetecatalyst.com
  • FL Statute 163.31771 (accessory dwelling units), 2026 Florida Statutes; SB 48 (2026) and SB 184 (2025) bill histories: flsenate.gov
  • FL Statute 553.792 (building permit application decision timeframes) and FL Statute 489.103(7) (owner-builder disclosure), 2026 Florida Statutes: flsenate.gov
  • Florida Building Code, Residential, Section R322.2.1, 8th Edition (2023) and 9th Edition (2026): floridabuilding.org and codes.iccsafe.org
  • Construction Corps published 2026 pricing (ADU range, garage-to-ADU conversions, detached ADU impact fee note): constructioncorps.com/estimator and constructioncorps.com/st-petersburg/adu-builder/

Back to Blog
Contact us media
Residential and Commercial Construction in Clearwater, Florida

Construction Corps is a family-run, veteran-owned, certified general contracting company with 35+ years of experience.

Contact us media
Accessibility: If you are vision-impaired or have some other impairment covered by the Americans with Disabilities Act or a similar law, and you wish to discuss potential accommodations related to using this website, please contact our Accessibility Manager at (727) 999-1855.